logo

Found 238 Products For "bzb auto spray booth"

calidad La pintura de la carrocería de TUV Auto fábrica

La pintura de la carrocería de TUV Auto

Brand Car Painting Equipments Customied Painting Production Line Project in Changchun FAW Some necessary main Equipment for some main process: Systems Equipment Details Pre-treamment 1. Flood wash equipment 2. Degrease equipment 3. Electrophoresis equipment 4. Electrophoresis equipment Chain conveyor system 1. Aluminium fixture block 2. Chain transit unit 3. Steel alloy track 4. Inverterters & gear motor Spray booth 1. Size:Customied 2. Fan exhaust system 3. Exhaust gas

calidad Líneas de pintura autos de la chapa del sitio 5min de la preparación del taller de reparaciones fábrica

Líneas de pintura autos de la chapa del sitio 5min de la preparación del taller de reparaciones

Fast Repair Paint line For Repair Shop Preparation Room Painting production line Main Brand: Baozhongbao(BZB) Jingzhongjing(JZJ) Two Produce Base: 1) Guangdong Jingzhongjing Industrial Painting Equipment Co., Ltd(In Guangzhou, Since 1999), which Cover 30, 000 M2, with 218 staff, Main Product: Spray booth and preparation room for Auto/Bus/Truck/Boat/Aircraft and all different industry, Auto sheet-metal line, Water Test line. Power coating line, focus on the producing for

calidad Líneas línea de pintura móvil lateral del coche del empuje proyecto auto de pintura de la chapa de la producción del espray fábrica

Líneas línea de pintura móvil lateral del coche del empuje proyecto auto de pintura de la chapa de la producción del espray

Sheet Metal Paint lines Side Push Moving Car Paint Line Auto Spray Production Project Sheet Metal Paint Line Equipment List in NormalNo.Item Name/Main FunctionMain SpecificationTotal Price(USD)1Awaiting Repaired/ Metal Sheet DisassemblyStation size: 7000×3550×3100 mm, ceiling cover frame, three sides with PVC curtain, back wall 50mm thick EPS panel.1 sets 2Puttying(Be an old coating polish and putty station.)Station size: 7000×3550×3100 mm, ceiling cover frame, three sides

calidad Cadena de producción de la pintura de espray de la motocicleta equipo automático del pintado con pistola fábrica

Cadena de producción de la pintura de espray de la motocicleta equipo automático del pintado con pistola

Motorcycle Spray Paint Production Line Automatic Paint Spraying Equipment Maint Process: workpiece paint pre-treatment--cathodic electrodeposition primer coating-- PVC glue--weld seam sealing-- middle coating--surface coating and drying-- check and repair process--and complete coating of paint material --products inspection work. Some necessary main Equipment for some main process: Systems Equipment Details Pre-treamment 1. Flood wash equipment 2. Degrease equipment 3.

calidad El lado agota la cabina de acero del polvo de la pintura de 10 micrones fábrica

El lado agota la cabina de acero del polvo de la pintura de 10 micrones

Side Exhaust Design Industry Paint Powder Booth Customer Made Spray Booth Product Application Jingzhongjing Group can produce different kind of painting lines equipment according customer's Requirement.All the equipment can help the metal product can the prefect surface finishing with high efficient and keep good protection for the envionmental and keep the heath for worker. Maint Process: workpiece paint pre-treatment--cathodic electrodeposition primer coating-- PVC glue-

calidad Cabina de la pintura del camión del autobús del TUV del CE de la elevación del hombre de Sheld del metal fábrica

Cabina de la pintura del camión del autobús del TUV del CE de la elevación del hombre de Sheld del metal

Man Lift for Bus Spray Booth Truck Paint Booth Customied Design paint booth line Product Application This follow machine is used in Some Industry workpiece painting and baking system.Full fill CE standard. Our Jingzhongjing Group can produce different kind of painting lines equipment according customer's Requirement. Maint Process: workpiece paint pre-treatment--cathodic electrodeposition primer coating-- PVC glue--weld seam sealing-- middle coating--surface coating and

calidad Sitio de chorreo con granalla del gran fan BZB 69kw fábrica

Sitio de chorreo con granalla del gran fan BZB 69kw

Big Fan Cabinet for Coating line Designer container Painting equipments prodution line Main Brand: Baozhongbao(BZB) Jingzhongjing(JZJ) Two Produce Base: 1) Guangdong Jingzhongjing Industrial Painting Equipment Co., Ltd(In Guangzhou, Since 1999), which Cover 30, 000 M2, with 218 staff, Main Product: Spray booth and preparation room for Auto/Bus/Truck/Boat/Aircraft and all different industry, Auto sheet-metal line, Water Test line. Power coating line, focus on the producing for

calidad Cabina de rociadura del extractor del lado del sitio de la pintura de la torre del viento para la cabina grande de la pintura de la cuchilla de la energía eólica fábrica

Cabina de rociadura del extractor del lado del sitio de la pintura de la torre del viento para la cabina grande de la pintura de la cuchilla de la energía eólica

Professional Painting Line Project China Super Design Project for Wind Power Blade Paint Booth Maint Process: workpiece paint pre-treatment--cathodic electrodeposition primer coating-- PVC glue--weld seam sealing-- middle coating--surface coating and drying-- check and repair process--and complete coating of paint material --products inspection work. Some necessary main Equipment for some main process: Systems Equipment Details Pre-treamment 1. Flood wash equipment 2.

calidad Línea de pintura proyecto para el proveedor de China de la cabina de espray del transporte de la carretilla de la cuchilla del viento fábrica

Línea de pintura proyecto para el proveedor de China de la cabina de espray del transporte de la carretilla de la cuchilla del viento

Painting Line Project for Wind Blade Trolley transport spray booth China Supplier Product Application This follow machine is used in Some Industry workpiece painting and baking system.Full fill CE standard. Our Jingzhongjing Group can produce different kind of painting lines equipment according customer's Requirement. Functional and structural requirements 1. Chamber body: use rock wool insulation board, and set up a folding movable partition wall at 43m in the length